ABB IRB 920 Product Manual page 96

Hide thumbs Also See for IRB 920:
Table of Contents

Advertisement

4 Maintenance
4.4.3 Inspecting the ball screw spline unit
Continued
3
4
5
6
7
8
96
Action
Release the holding brake by pressing the button
on the internal brake release unit.
Move the outer arm to a position where the axis 3
can be moved in full stroke.
Press the brake release button and move the shaft
to its upper and lower limits manually.
Visually inspect:
the stop blocks on the ball screw spline unit
the shaft of the ball screw spline unit
Look for abrasions, cuts or crush damages on the
spline, and grease amount on the shaft.
Apply grease to the shaft if it is not enough.
Replace the ball screw spline unit if wear or dam-
age is detected.
© Copyright 2022 ABB. All rights reserved.
Note
xx2000001155
xx2000001155
xx2000001158
See
Lubricating the ball screw
spline unit on page
106.
See
Replacing the ball screw on
page
488.
Product manual - IRB 920
3HAC075721-001 Revision: C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 920 seriesIrb 920-6/0.55Irb 920-6/0.65Irb 920t-6/0.45Irb 920t-6/0.55Irb 920t-6/0.65

Table of Contents