ABB IRB 920 Product Manual page 756

Hide thumbs Also See for IRB 920:
Table of Contents

Advertisement

5 Repair
5.7.1 Replacing the axis-1 motor sub-assembly
Continued
3
4
5
Continues on next page
756
Action
Refit the cable ferrule and secure it with the
screws.
Tip
The air hoses should face the process hub side.
Tip
The position with wrapped tape is the marked
position for the cable ferrule.
Tip
Align all the cable ferrules so that the cable is in
a natural bending position to avoid twisting.
Secure the cable ferrule to the bracket.
Tip
Align all the cable ferrules so that the cable is in
a natural bending position to avoid twisting.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
Refit the bracket without securing.
Tip
Do not secure it with the screws before the cable
ferrule installed well.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
© Copyright 2022 ABB. All rights reserved.
Note
Screws: Hex socket head cap
screw M3x8 12.9 Lafre 2C2B/FC6.9
(2 pcs)
Tightening torque: 1.2 Nm ±10%
xx1800002849
Screws: Hex socket head cap
screw M3x8 12.9 Lafre 2C2B/FC6.9
(2 pcs)
Tightening torque: 1.2 Nm ±10%
xx2100000940
Product manual - IRB 920
3HAC075721-001 Revision: C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 920 seriesIrb 920-6/0.55Irb 920-6/0.65Irb 920t-6/0.45Irb 920t-6/0.55Irb 920t-6/0.65

Table of Contents