ABB IRB 920 Product Manual page 406

Hide thumbs Also See for IRB 920:
Table of Contents

Advertisement

5 Repair
5.6.1 Replacing the mechanical stopper
Continued
3
Refitting the extension shaft for Clean Room/ IP54 robots
1
2
Continues on next page
406
Action
Refit the screw.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
For robots with protection class IP54 (option 3350-
540)
For robots with protection type Clean Room (op-
tion 3351-1)
Install the extension shaft to the ball screw on the
upper side of the mechanical stopper.
Note
For robots with protection class IP54 (option 3350-
540)
Check the gasket for the extension shaft and re-
place it if needed.
© Copyright 2022 ABB. All rights reserved.
Note
Screws: Hex socket head cap
screw M4x16 12.9 Lafre
2C2B/FC6.9 (1 pcs)
Tightening torque: 6.5 Nm
xx1800002858
Note
xx2100002421
Product manual - IRB 920
3HAC075721-001 Revision: C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 920 seriesIrb 920-6/0.55Irb 920-6/0.65Irb 920t-6/0.45Irb 920t-6/0.55Irb 920t-6/0.65

Table of Contents