ABB IRB 920 Product Manual page 590

Hide thumbs Also See for IRB 920:
Table of Contents

Advertisement

5 Repair
5.6.8 Replacing the axis-4 second timing belt
Continued
3
Refitting the transmission module assembly to the outer arm
1
2
3
Continues on next page
590
Action
Refit the transmission module flange and secure
with the screws and washers.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
Refit the transmission module assembly to the
outer arm.
Tip
Place the axis-4 second timing belt through the
ball screw flange.
Secure with the screws without fully tightened.
© Copyright 2022 ABB. All rights reserved.
Note
Screws: Hex socket head cap
screw M4x16 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Washers: Spring washer 9x4.3x1
Steel (4 pcs)
Tightening torque: 3.5 Nm ±10%
xx2100001092
Note
Screws: Hex socket head cap
screw M4x20 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Washers: Plain washer machining
4.2x9x2 steel (4 pcs)
Tightening torque: 2.6 Nm ±10%
xx2100001091
Product manual - IRB 920
3HAC075721-001 Revision: C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 920 seriesIrb 920-6/0.55Irb 920-6/0.65Irb 920t-6/0.45Irb 920t-6/0.55Irb 920t-6/0.65

Table of Contents