Power Up And Rom Verification Test; Functional Test - ENCAD CADJET 2 Service Manual

Table of Contents

Advertisement

6.5

Power Up and ROM Verification Test

6.5.1
1.
WARNING
2.
3.
4.
All you need to do for the Functional Test is to connect power to the
unit and turn the ON/OFF Switch to the "ON" position. The purpose of
this test is to verify that the unit powers up. If it does not power up,
see the Decision Logic Tables in Chapter 4.
CADJET 2

Functional Test

IF THE MACHINE DOESN'T POWER-UP, IT MUST BE
TURNED OFF IMMEDIATELY TO ELIMINATE ANY DAMAGE
UNTIL THE PROBLEM CAN BE RESOLVED.
For static control, you must be grounded to a static station
by a wrist strap.
installing EPROM's, Carriage, and MPCB.
Do not slide the Carriage at any time when the power is
"ON."
This may damage the plotter.
CARTRIDGES key instead.
When moving the plotter around, disconnect the power from
the plotter each time.
This is important when removing or
Calibration
Use the ACCESS
6-21

Advertisement

Table of Contents
loading

Table of Contents