Installing The Power Supply And On/Off Switch - ENCAD CADJET 2 Service Manual

Table of Contents

Advertisement

9.2

Installing the Power Supply and ON/OFF Switch

1. If the ON/OFF Switch was removed, push the new switch into
place. Position it so the switch is on top and the prongs for the
Power Cord are on the bottom (see Chapter 1, Figure 1.3).
Connect the ground wire to the inside of the Platen (see
Figure Chapter 5 .24).
2. Connect the Power Cable coming from the MPCB to the connector
on the Power Supply. Make sure that the ground from the Power
Cable is still connected to the inside of the Platen, at the same
location
Figure Chapter 5 .24).
3. Insert the Power Supply part way into the Platen.
4. Connect the Power Switch cable to the connector on the Power
Supply.
Note:
NOTE
5. Position the Power Supply in place inside the Platen and insert the
screws through the bottom of the Platen and into the Power
Supply. Use a #2 Phillips screwdriver to tighten the screws. (Do
not overtighten them).
6. Reinstall the Left Side Plate, Left Cover Assembly, and the Top
Cover. See Section 8.4.
CADJET 2
as
the
ground
You may find it easier to align the screws with the Power
Supply if you turn the Platen onto its back side.