Intec MLC 8000 Operating Manual page 65

Lift controller
Table of Contents

Advertisement

INTEC GmbH
Lift controller MLC 8000
22/12/2016
Operating manual V2.0
1. Menu level
2. Menu level
Doors
Load measurement
Modem/Ethernet
3. Menu level
4. Menu level
Example:
POS2:
1.02
AWG2:
---
Example:
Door1:
ok
Door2:
(FVE)
Example:
Door1: AT40
HW:Rev.01
SW:V01.25
Example:
MCAN
HW:V1.0
SW:V1.0
Example:
Ethernet
65/196
Since AWG2 and POS2 are on a separate CAN -Bu , the module test
can only be performed when the CAN bus is connected to the control
bus (on which also the HSE is connected) or can be connected via
relay (the relay is switched through special output "CAN-AWG").
In the example the CAN bus connection wokrs well to POS2, the
software version of POS2 is 1.02.
The CAN bus connection to AWG2 is interrupted or AWG2 is defective.
Doors module test (CANopen doors)
The example indicates that door 1 is controlled via CAN open (see
more details by pressing ENTER). Door 2 is controlled by inputs and
outputs directly through the FVE (no further action by pressing
Display of the door type as well as the hardware and software version
Menu is only available if a load measurement device with CAN bus
1st line: Name of the load measurement unit
2nd Line: Current Software Version of the load measurement unit
3rd Line: Current Hardware version of the load measurement unit
163 kg
Hardware test Onboard module (Ethernet/Modem)
nd
2
line: Last command to the module
3rd line right: Monitoring time
Description
ENTER).
of door controller.
connection is used
4th line: Actual load value
1st line: module type
3rd line left: Modem state

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents