Shutting Down The Instrument; Power Fuses - R&S SMB100A Operating Manual

Rf and microwave signal generator
Hide thumbs Also See for SMB100A:
Table of Contents

Advertisement

®
R&S
SMB100A
Power on settings ("Level/EMF" menu)
Network settings ("Setup" menu)
GPIB address ("Setup" menu)
*IDN? Identification and emulation ("Setup" menu)
Password and settings protected by passwords ("Setup" menu)
Start/Stop Display Update ("Setup" menu)
Display and keyboard settings ("Setup" menu)
User-defined instrument states can be stored and called up in the "File" dialog.

2.3.6 Shutting Down the Instrument

To shut down the R&S SMB, proceed as described below.
Risk of losing data
If you switch off the running instrument using the rear panel switch or by disconnecting
the power cord, the instrument loses its current settings. Furthermore, program data
may be lost.
Press the ON/STANDBY key first to shut down the application properly.
1. Press the ON/STANDBY key to save the current setup, shut down the operating
system and set the instrument to standby state.
The yellow LED must be on.
2. To switch off the power, press the main power switch to position 0 (Off).
None of the front-panel LEDs should be on.

2.3.7 Power Fuses

The R&S SMB is fully fused by two fuses IEC60127-T3.15H/250 V.
The fuses are accommodated in the fuse holders next to the power connector. Use
only fuses of the mentioned type.