2005-06-01

10.4.2 Assembling

Ensure all parts are intact and clean before assembly.
Follow all instructions if both bearings have been replaced
• Place the bearing cap (9) on the rotor axle's D-side.
• Press the bearing (6) on the rotor axle.
• Press the bearing (5) on the rotor axle's N-side.
• Mount the support ring (17) and circlip (16) on the axle's D-side.
• Fit the gasket (19) with the assembly device.
NOTE
Always use a new gasket when fitting the rotor axle.
• Install the rotor in the end shield (2).
• Tighten the bearing cap (9) using the screws (22) to a torque of 6
Nm.
• Fit the rotor (4) in the stator (1).
• Put the washer (7) on the bearing (5).
Ensure that the terminal block assembly 11 is in position
• Install the end shield (3).
• Tighten the stud screws (20) and nuts (21) to a torque of 5 Nm.
• Fit the ferrite block on the sensor cable.
• Fit the protective plate (8) on the N-side.
• Secure the cables from the thermocontact and the sensor bearing to
one of the power cables.
If only the pulse sensor bearing is replaced:
• Press the bearing (5) on the rotor axle's N-side.
• Put the washer (7) on the bearing (5).
Ensure that the terminal block assembly 11 is in position
• Install the end shield (3).
• Tighten the stud screws (20) and nuts (21). With a torque wrench,
tighten the nuts to 5 Nm.
• Fit the ferrite block on the sensor cable.
• Fit the protective plate (8) on the N-side.
• Secure the cables from the thermocontact and the sensor bearing to
one of the power cables.
Service Manual
REFLEX RR B/E, RR B/E CC
https://www.forkliftpdfmanuals.com/
Valid from serial number
713962-
Order number
218920-040
© BT Europe AB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents