Preventive Maintenance - P2; Maintenance Schedule; Rr B/E 1-8 - BT REFLEX RR B Service Manual

Table of Contents

Advertisement

Table 4: Maintenance schedule RR B/E 1-8
Pos.
Work to carry out
no.
Interval in hours
Interval in days/weeks/months
0000
Chassis
0000.1
Check for cracks or damage
0340.1
Check door locking and lubricate door
hinges
0350.1
Lubricate the runners in the reach car-
riage
0390.1
Check the battery mounting and wear to
the battery lock.
0390.2
Check the locking of the roller bed
0510.1
Tighten hinges and guides on the cab
0620.1
Check the mounting of the seat and
adjustment functions.
0640.1
Check the operation of the driver's con-
trols
0640.2
Check the wheel function
0640.3
Check the brakes
0640.4
Check pedal function
0640.5
Check the horn
0810.1
Check the attachment of the machine
housing and the protective roof.
0820.1
Check the pinch guard
0840.1
Check the emergency switch
© BT Europe AB
Preventive maintenance – P2

Maintenance Schedule

Valid from serial number
713962-
Order number
218920-040
5- Preventive maintenance – P2
5.1 Maintenance Schedule

5.1.1 RR B/E 1-8

Service Manual
https://www.forkliftpdfmanuals.com/
5
20
1 d 1
wk
U
U
U
U
U
U
U
REFLEX RR B,E RR B,E CC
T-code
403-414, 669-671, 716-718
Date
2005-09-09
250
500
1000
3 m
6 m
12 m
X
A
F
X
X
A
X
X
X
X
X
X
X
X
X
3000
36 m
5- 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents