Table 5: Maintenance schedule RR B/E 2-8 CC
Pos.
Work to carry out
no.
Interval in hours
Interval in days/weeks/months
0000
Chassis
0000.1
Check for cracks or damage
0340.1
Check door locking and lubricate door
hinges
0350.1
Lubricate the runners in the reach car-
riage
0390.1
Check the battery mounting and wear to
the battery lock.
0390.2
Check the locking of the roller bed
0510.1
Tighten hinges and guides on the cab
0620.1
Check the mounting of the seat and
adjustment functions.
0640.1
Check the operation of the driver's con-
trols
0640.2
Check the wheel function
0640.3
Check the brakes
0640.4
Check pedal function
0640.5
Check the horn
0810.1
Check and tighten the machine housing
attachment
0820.1
Check the pinch guard
0840.1
Check the emergency switch
1700
Motors
1700.1
Check for any loose connections
1700.2
Check and tighten mounting bolts
1700.3
Check for noise in the bearings
1730.1
Check steering motor's carbon brushes
© BT Europe AB
Preventive maintenance – P2
Maintenance Schedule
Valid from serial number
713962-
Order number
218920-040

5.1.2 RR B/E 2-8 CC

Service Manual
https://www.forkliftpdfmanuals.com/
5
20
1 d
1
wk
U
U
U
U
U
U
U
REFLEX RR B,E RR B,E CC
T-code
403-414, 669-671, 716-718
Date
2005-09-09
250
500 1000 3000
3 m 6 m 12 m 36 m
X
A
F
X
X
A
X
X
X
X
X
X
X
X
X
X
X
X
X
5- 11