Table 5: Maintenance schedule RR B/E 2-8 CC
Pos.
Work to carry out
no.
Interval in hours
Interval in days/weeks/months
5000
Electrical Panel
5000.1
Clean and check the mountings
5000.2
Tighten cable connections
5000.3
Check the emergency driving functions
5000.4
Check error code log and operation
times
5190.1
Check contactor points
5190.2
Check movement in the contactor
5280.1
Check electrical limiting functions
5110
Battery
5110.1
Check electrolyte levels (10-15 mm over
cell plates)
5110.2
Check connections on the battery, truck
and charger
5110.3
Check the cell and pole guards
5110.4
Check fluid density
5110.5
Check temperature
5110.6
Remove overflow fluid from the battery
trough
5110.7
Check for wear to the locking catch
6000
Hydraulic system
6110.1
Check the tank, mounting and leakage
6110.2
Check oil levels
6110.3
Clean or replace the oil
6120.1
Check the hoses, pipes and couplings
6120.2
Check for wear to hoses on the mast and
reach carriage
6130.1
Change air and oil filters
6170.1
Check overflow pressure
6600
Cylinders
6600.1
Check for leakage
© BT Europe AB
Preventive maintenance – P2
Maintenance Schedule
Valid from serial number
713962-
Order number
218920-040
Service Manual
https://www.forkliftpdfmanuals.com/
5
20
1 d
1
wk
U
U
U
U
U
U
U
U
REFLEX RR B,E RR B,E CC
T-code
403-414, 669-671, 716-718
Date
2005-09-09
250
500 1000 3000
3 m 6 m 12 m 36 m
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
B
X
X
X
X
X
5- 13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents