BT REFLEX RR B Service Manual page 368

Table of Contents

Advertisement

35- 4
Main mast –7100
Assembling the mast
T-code
403-414, 669-671, 716-718
Date
2005-06-01
• Use the Mast assembly kit that contains the following:
- 2 bolts and 2 washers to secure the mast in the reach carriage at
the bottom of the mast.
- 6 bolts for securing the load support.
- 0 – 6 shims for aligning the mast angle forwards and backwards.
The mast should be 90° ± 10'.
- 1 two-part hose clip for the feeder hose on the mast.
• Cut off the steel band on the mast, except the top band.
• Lift up the mast using an overhead crane and tool
11-1091 for B/E1-B/E3, B/E4-B/E6 and
11-1133 for B/E7-B/E8
Service Manual
REFLEX RR B,E RR B,E CC
https://www.forkliftpdfmanuals.com/
Valid from serial number
713962-
Order number
218920-040
© BT Europe AB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents