Figure 69: Creating A Communication Link - Step 2; Figure 70: Creating A Communication Link - Step 3 - WAGO 750-8207 Manual

Pfc200 cs 2eth rs 3g plc - controller pfc200
Table of Contents

Advertisement

234 Run-time System CODESYS 2.3
3.
In the "Name" field enter a designation for your fieldbus controller and then
click on "Tcp/Ip (Level 2 Route)". Then click [OK].
Figure 69: Creating a Communication Link – Step 2
4.
In the "Communication Parameters" window enter the IP address of your
fieldbus controller in the "Address" field and then press Enter. To close
the window, click on [OK].
To select an already created controller, select it in the left window and then
click on [OK].
Figure 70: Creating a Communication Link – Step 3
5.
Transfer the PLC program by clicking on Online in the menu bar and select
Login.
6.
Ensure that the Run/Stop switch for the fieldbus controller is set to "Run".
7.
Start the PLC program by clicking on Online > Start in the menu bar.
Manual
Draft version 1.2.1 from 2017-09-13, valid from FW Version 02.06.20(09)
WAGO-I/O-SYSTEM 750
750-8207 PFC200 CS 2ETH RS 3G

Advertisement

Table of Contents
loading

Table of Contents