Using A Measuring Instrument - YASKAWA SGD7S Product Manual

Servopack with mechatrolink-iii
Hide thumbs Also See for SGD7S:
Table of Contents

Advertisement

Parameter
n.00
(default
Motor Speed
setting of
Pn007)

n.
01
Speed Reference
n.02
(default
Torque Reference
setting of
Pn006)

n.
03
Position Deviation
Position Amplifier Devi-

n.
04
ation
Position Command

n.
05
Speed
Pn006
Reserved parameter

n.
06
or
(Do not change.)
Pn007
Motor - Load Position

n.
07
Deviation

n.
08
Positioning Completion

n.
09
Speed Feedforward

n.
0A
Torque Feedforward

n.
0B
Active Gain
Completion of Position
n.0C
Reference Distribution
External Encoder

n.
0D
Speed

n.
10
Main Circuit DC Voltage 1 V/100 V (main circuit DC voltage)
*
Refer to the following section for details.
8.12.1 Gain Switching on page 8-66
9.3 Monitoring Machine Operation Status and Signal Waveforms
Monitor Signal
• Rotary Servomotor: 1 V/1,000 min
• Linear Servomotor: 1 V/1,000 mm/s
• Rotary Servomotor:1 V/1,000 min
• Linear Servomotor:1 V/1,000 mm/s
1 V/100% rated torque
0.05 V/Reference unit
0.05 V/encoder pulse unit
• Rotary Servomotor:1 V/1,000 min
• Linear Servomotor:1 V/1,000 mm/s
0.01 V/Reference unit
Positioning completed: 5 V
Positioning not completed: 0 V
• Rotary Servomotor:1 V/1,000 min
• Linear Servomotor:1 V/1,000 mm/s
1 V/100% rated torque
1st gain: 1 V
*
2nd gain: 2 V
Distribution completed: 5 V
Distribution not completed: 0 V
1 V/1,000 min

9.3.3 Using a Measuring Instrument

Description
Output Unit
-1
-1
-1
-1
-1
Remarks
0 V for speed or
torque control
Position deviation
after electronic gear
conversion
Completion is indi-
cated by the output
voltage.
The gain that is
active is indicated
by the output volt-
age.
Completion is indi-
cated by the output
voltage.
Value calculated at
the motor shaft
9
9-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents