Leak Testing Epc And Manual Inlets; Preparation - Agilent Technologies 6890 Series Service Manual

Gas chromatograph
Hide thumbs Also See for 6890 Series:
Table of Contents

Advertisement

230
Cool On-Column Inlet

Leak testing EPC and manual inlets

Leak testing EPC and manual inlets

Preparation

1.
Cool the column to ambient.
2.
Remove the column from the inlet fitting on the inside of the oven.
3.
If the quality of the septum is unknown, replace it now.
Figure 230-7
4.
Cap the septum purge vent and the inlet's column fitting. Use solid
(no-hole) Vespel type ferrules 1/8-inch (part no. 0100-1372) and 1/16-
inch (part no. 5181-7458) with a 1/8-inch Swagelok nut (part no.
5180-4103) and a capillary column nut.
Note
As alternate capping devices, a 1/8-inch Swagelok cap can be used for the
septum purge vent and a capillary column nut with a solid piece of wire the
size of a paper clip and a 0.5 mm ID graphite ferrule may be used for the inlet
column fitting.
10 of 20
Septum retainer
Septum
Spring
Insert
Location of septum
Inlets
Agilent 6890 Gas Chromatograph Service Manual
Jun 2001

Advertisement

Table of Contents
loading

This manual is also suitable for:

6890a6890 plus

Table of Contents