Agilent Technologies 6890 Series Service Manual page 257

Gas chromatograph
Hide thumbs Also See for 6890 Series:
Table of Contents

Advertisement

320
Nitrogen Phosphorus Detector (NPD)
Replacement procedures
Check for interference
Figure 320-14
7.
Route the gas tubing behind the manifold, over the top of the chassis, and
through the slots.
8.
Connect the ribbon cable to the mating connector on the pneumatics
board. Arrange the cable to keep it away from the valves and keep it from
being pinched against the manifold.
For the back detector, you may want to loosen the manifold and slide it
out of the carrier a few centimeters to connect the cable to the pneumatics
board. Then, reinstall the manifold.
9.
Secure the manifold in place using the Torx T-20 screw.
10. Using a pair of needle-nosed pliers, remove the appropriate top rear panel
detector cutout for the NPD. Also remove any cutouts needed to access
other manifolds or accessories installed in the GC. See Figure 320-15.
26 of 32
Manifold, after installation
Detectors
Agilent 6890 Gas Chromatograph Service Manual
Bracket is flush with
carrier rails
Attach gang fitting
Jun 2001

Advertisement

Table of Contents
loading

This manual is also suitable for:

6890a6890 plus

Table of Contents