8.
Insert the liner into the inlet from above until the unpacked side of the
ferrule rests on the top of the inlet.
9.
Replace the sampling head and reconnect the lines, if necessary.
10. Check all connections for leaks. If necessary, tighten them again by hand.
Jun 2001
Programmed Temperature Vaporization Inlet (PTV)
Inlets
Agilent 6890 Gas Chromatograph Service Manual
Replacement procedures
240
37 of 46