240
Programmed Temperature Vaporization Inlet (PTV)
Leak testing the PTV module only
On the inlet
•
Septum (septum head only)
•
Lower inlet seal at bottom of inlet
•
Ferrule on inlet liner
•
Connections for carrier gas, septum purge (septum head only)
At EPC module
•
O-rings behind the block where the inlet's pneumatic lines enter the
module
•
Two O-rings for each valve
•
Septum purge cap (septum head only)
•
Chemical trap O-rings
•
O-rings in gang fitting
46 of 46
Inlets
Agilent 6890 Gas Chromatograph Service Manual
Jun 2001