250
Volatiles Interface
Replacement procedures
Figure 250-9
2.
Remove the heater/sensor wire connector from the GC connection.
Figure 250-10
12 of 30
Removing the transfer line
= heater/sensor cable routing
Heater/sensor cable routing
Inlets
Agilent 6890 Gas Chromatograph Service Manual
Front inlet connector
Back inlet connector
Jun 2001