To gas supply
Figure 230-10
10. If the leaky component is serviceable, such as vent/inlet fittings (see the
following diagram of serviceable parts, Figure 230-11), replace them.
Otherwise, replace the EPC module.
Jun 2001
Leak testing EPC and manual inlets
Leak testing the EPC module on the lab bench
Inlets
Agilent 6890 Gas Chromatograph Service Manual
Cool On-Column Inlet
Ribbon cable from
leak test kit
230
17 of 20