Agilent Technologies 6890 Series Service Manual page 217

Gas chromatograph
Hide thumbs Also See for 6890 Series:
Table of Contents

Advertisement

310
Flame Ionization Detector (FID)
Replacement procedures
2.
Unclip the ignitor cable from the detector's interface board on the right
side of the instrument.
Collector nut/ignitor
castle/ignitor assembly
Upper collector insulator
Collector
Lower collector insulator
Collector block
Figure 310-9
3.
Unscrew the knurled collector nut from the collector block.
4.
Lift the collector nut, ignitor castle and ignitor cable assembly off of the
collector body.
5.
Lift the collector from the collector housing. The upper insulator will be
on top of it.
6.
If desired, remove the lower collector insulator with tweezers.
7.
Reassembly is reverse of removal.
10 of 24
Collector assembly (exploded diagram)
Detectors
Agilent 6890 Gas Chromatograph Service Manual
Jun 2001

Advertisement

Table of Contents
loading

This manual is also suitable for:

6890a6890 plus

Table of Contents