16. Slide the flow module out of the carrier. Guide the gas lines through the
slot in the front of the carrier.
Figure 250-15
17. Replace the EPC flow module.
18. Reassemble in reverse order. Remember to fold the module ribbon cable
and reconnect the ribbon cable from the front inlet, if applicable.
Jun 2001
Replacing the EPC flow module.
Inlets
Agilent 6890 Gas Chromatograph Service Manual
Volatiles Interface
Replacement procedures
250
17 of 30