Executing Open Compensation - Agilent Technologies Twelfth 4287A RF LCR Operation Manual

Table of Contents

Advertisement

Step 1. Set the DUT connection terminal of the test fixture to the state in which short
compensation is performed. For information on the procedure to set the short state, see the
Operation Manual for the test fixture to be used.
Step 2. Press the
cursor to the
Step 3. Press the
bar in the Compensation progress indicator in the compensation window indicates the
progress of the short compensation data measurement. Upon completion of short
compensation data measurement, the screen changes to the next window (Figure 3-26).

Executing open compensation

Figure 3-26
Window for open compensation
Step 1. Set the DUT connection terminal of the test fixture to the state in which open compensation
is performed. For information on the procedure to set the open state, see the Operation
Manual for the test fixture to be used.
Step 2. Press the
cursor to the
Step 3. Press the
bar in the Compensation progress indicator in the compensation window indicates the
progress of the open compensation data measurement. Upon completion of open
compensation data measurement, the screen changes to the next window (Figure 3-27).
Chapter 3
key or
key on the front panel the required number of times to move the
Next>
button.
key on the front panel to start measurement of short compensation data. The
key or
key on the front panel the required number of times to move the
button.
Next>
key on the front panel to start measurement of open compensation data. The
Learning Basic Operations
Calibration and Compensation
67

Advertisement

Table of Contents
loading

Table of Contents