Agilent Technologies Twelfth 4287A RF LCR Operation Manual page 59

Table of Contents

Advertisement

Step 2. Press the rotary knob (
window (Figure 3-10).
Figure 3-10
Calibration and compensation wizard welcome window
Step 3. Press the
Measurement
Step 4. Press the
cursor to the
Step 5. Press the
fixture stand (Figure 3-11) appears.
Figure 3-11
Display for setting up test head and test fixture stand
Step 6. Confirm that the setup has been performed as shown in Figure 3-2, "Connection between
test head and fixture stand," on page 52 (in this condition nothing should be connected to
the 7-mm terminal).
Chapter 3
) to display the calibration and compensation wizard welcome
key or
key on the front panel to select the
option () (filled circle should appear inside the radio button).
key or
key on the front panel the required number of times to move the
Next>
button.
key on the front panel. The window for setting up the test head and test
Learning Basic Operations
Calibration and Compensation
Cal/Compen for a Fixture
59

Advertisement

Table of Contents
loading

Table of Contents