Main Menu
Main Menu
Steering Gearbox
Removal/Installation
12. Disconnect the connectors from the EPS wire har-
ness.
13. Remove the ground cable by removing the EPS wire
harness stay.
EPS WIRE
HARNESS STAY
14. Remove the terminal guard and ground cable.
15. Remove the terminal nuts and the wires from the
gearbox terminals.
GROUND CABLE
FLANGE BOLT
10 N-m (1.0 kg-m, 7 Ib-ft)
Table of Contents
Table of Contents
EPS WIRE HARNESS
GROUND
CABLE
FLANGE BOLT
10 N-m (1.0 kg-m, 7 Ib-ft)
TERMINAL NUTS
10 N-m
(1.0 kg-m, 7 Ib-ft)
NOTE: After tight-
ening the terminal
nuts, bend up the
terminal tabs
against the nuts
securely.
FLANGE BOLT
10 N-m (1.0 kg-m, 7 Ib-ft)
TERMINAL
GUARD
Corrosion resistant bolt
16. Remove the radiator pipe bracket at the front com-
partment bulkhead.
17. Remove the radiator pipe bracket at the floor, and
space the radiator pipe away from and gearbox.
RADIATOR PIPE
RADIATOR PIPE BRACKET
RADIATOR PIPE
RADIATOR PIPE
BRACKET