JUKI KE-3010 Maintenance Manual page 54

High-speed chip shooter, high-speed flexible mounter
Table of Contents

Advertisement

4)
Pull the Y veyor-cable, XY veyor-cable in the direction
movable end (rear side) of the Y-cableveyor in the cable arrangement direction.
5)
Push in the cables in the direction
side) of the Y-cableveyor in the cable arrangement direction.
6)
Adjust the cable position so that the center position between two markings is located at the
end (movable end) of the Y-cableveyor, and then secure the cables.
Y VEYOR-CABLE ASM
XY VEYOR-CABLE ASM
1394 ROBOT CABLE
OPTICAL FIBER CABLE 6.5M
Air tube
Rear side
7)
According to the Figure below, connect each connector and secure the cables with the
tie-up bands.
Figure 1-6-6-4-1 M and L Board
Maintenance Guide
and put the white marking at the movable end (rear
End of cableveyor
Adjust that the center position between two
markings (white lines) of the XY and Y veyor-cables
is located at the end of the cableveyor.
Figure 1-6-6-3
Specifications
1-43
and put the white marking at the
Figure 1-6-6-4-2 XL Board
Specifications
Rev. 2.0
Front side

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ke-3020vKe-3020vr

Table of Contents