JUKI KE-3010 Maintenance Manual page 50

High-speed chip shooter, high-speed flexible mounter
Table of Contents

Advertisement

3)
For the cable head side (movable end), adjust the marking position of each cable to the
upper end of "FC_SUPPORT" (end on the outlet side) and secure them.
4)
Push in the XY veyor-cable (XY veyor-cable XL), 1394 robot cable and the optical fiber
cable 7M in the direction
cable arrangement direction. Pull the cables in the direction
the white marking at the end of the X-cableveyor in the cable arrangement direction.
5)
Adjust the cable position so that the center position between two markings is located at the
end of the X-cableveyor, and then secure the cables.
Make the adjustment so that the center position between two markings (white lines) of
the XY veyor-cables is located at the end of the cableveyor.
6)
Push the cables inside the cableveyor by hand to check that they are flexible.
Maintenance Guide
Adjust the marking to the FC_SUPPORT end.
Figure 1-6-3-3
and put the white marking at the end of the X-cableveyor in the
Figure 1-6-3-4
1-39
Rev. 2.0
shown in the Figure and put

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ke-3020vKe-3020vr

Table of Contents