Figure 3-77 Floor Mount Spacing Guide; Floor Mounting The 19" (Chs2U-Us) Chassis - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100
F
S
5
LOOR
ECTION
5.1
System Hardware Manual
12.
Connect grounding wire to chassis. Refer to Chapter 4
paragraph
Expansion (CHS2U E) Chassis on page 3-24
details on grounding the system.
13.
Refer to
Expansion Chassis on page 3-39
cord or, Chapter 6 paragraph
Precautions on page 4-4
M
OUNTING THE

Floor Mounting the 19" (CHS2U-US) Chassis

The CHS2U-US controlling and expansion chassis can be mounted on the
floor using the CHS BASE UNIT and the CHS2U JOINT BRACKET KIT.
5.1.1
CHS2U-US Chassis Installation
1.
Use the template shown in
Guide
(10mm) anchor bolts (locally procured).
3.5 Installing the 9.5" Base (CHS2U B-US) and
3.5.5 Install AC Power Cord on 9.5" Base and
for installation of blades.
C
HASSIS
Figure 3-77 Floor Mount Spacing
for required spacing before drilling holes for 0.39"

Figure 3-77 Floor Mount Spacing Guide

for complete
for installation of the power
2.1 Installation and Safety
Issue 2.0
3 - 67

Advertisement

Table of Contents
loading

Table of Contents