UNIVERGE SV8100
System Hardware Manual
3.3.2.4
Connect the Controlling and Expansion Chassis
Expansion Chassis Interface Unit
for the Expansion Chassis
PZ-BS11
Expansion Chassis Interface Unit
for the Controlling Chassis
PZ-BS10
Figure 3-19 19" Expansion Chassis Interface Units
1.
2.
Installment of the PZ-BS10 blade and PZ-BS11 blade(s) must
be completed prior to installation of the provided (CAT 5)
expansion cabling.
Ensure Controlling and Expansion chassis are
powered down.
Using the NEC provided CAT5 straight-through
cable(s), attach one end to each Expansion Chassis
CN2 connector on the PZ-BS11 blade (see
3-20 System Expansion Cabling on page
Attach the opposite end to the CN2, CN3 or CN4
connector on the PZ-BS10 of the Controlling
Chassis.
Issue 2.0
Figure
3-18).
3 - 17