Connect The Controlling And Expansion Chassis; Figure 3-45 Pz-Bs11 Blade Installed - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 2.0
3 - 36
9.
Align the door tabs with hinges and close the cover.
3.5.2.4

Connect the Controlling and Expansion Chassis

Installment of the PZ-BS10 blade and PZ-BS11 blade(s) must
be completed prior to installation of the provided (CAT 5)
expansion cabling.
1.
Ensure Controlling and Expansion chassis are
powered down.
2.
Using the NEC provided CAT5 straight-through
cable(s), attach one end to each Expansion Chassis
CN2 connector on the PZ-BS11 blade (see
3-46 System Expansion Cabling on page
Attach the opposite end to the CN2, CN3 or CN4
connector on the PZ-BS10 of the Controlling
Chassis.

Figure 3-45 PZ-BS11 Blade Installed

Installing the SV8100 Chassis
UNIVERGE SV8100
Figure
3-37).

Advertisement

Table of Contents
loading

Table of Contents