Install Grounding On 19" Chassis - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 2.0
3 - 18
Figure 3-20 System Expansion Cabling
3.
3.3.3

Install Grounding on 19" Chassis

From the factory, the SG, ETH and PBXG grounds are located inside
the chassis and are connected to the FG ground (frame ground) on
the back of the chassis.
Each chassis (CHS2U-US) in the system must be grounded
separately using the procedure listed below.
1.
Ensure each Chassis is powered down and unplugged.
Install in Expansion
Chassis
Install in Expansion
Chassis
Install in Expansion
Chassis
Install in Controlling
Chassis
Repeat for additional Expansion Chassis.
UNIVERGE SV8100
Installing the SV8100 Chassis

Advertisement

Table of Contents
loading

Table of Contents