Commissioning With Profibus; Sequence Of Operations During Commissioning - Siemens Sinamics S110 Function Manual

Hide thumbs Also See for Sinamics S110:
Table of Contents

Advertisement

Commissioning with PROFIBUS

3.1

Sequence of operations during commissioning

Once the basic requirements have been met, you may proceed as follows to commission the
drive:
Table 3- 1
Note
If motors with a DRIVE-CLiQ interface are used, all motor and encoder data should be saved
in a non-volatile manner for spare part usage of the Sensor Module on the motor via p4692 =
1.
Function Manual
Function Manual, 01/2011, 6SL3097-4AB10-0BP3
Commissioning
Step
1
Create project with STARTER.
2
Configure the drive unit in STARTER.
3
Save the project in STARTER.
4
Go online with the target device in STARTER.
5
Load the project to the target device.
6
The motor starts to run.
Activity
3
45