Commissioning with PROFIBUS
3.1
Sequence of operations during commissioning
Once the basic requirements have been met, you may proceed as follows to commission the
drive:
Table 3- 1
Note
If motors with a DRIVE-CLiQ interface are used, all motor and encoder data should be saved
in a non-volatile manner for spare part usage of the Sensor Module on the motor via p4692 =
1.
3.1.1
Safety guidelines
A hazardous voltage will be present in all components for a further five minutes after the
system has been shutdown.
Note the information on the component!
A project with Safety Integrated may not be created offline.
Note
The design guidelines and safety information in the Manuals must be carefully observed
(refer to the SINAMICS S documentation, Equipment Manual).
CAUTION
In STARTER, after the changeover of the axis type via p9302/p9502 and subsequent
POWER ON, the units that depend on the axis type are only updated after a project upload.
Drive functions
Function Manual, 10/2008, 6SL3097-4AB10-0BP0
Commissioning
Step
1
Create project with STARTER.
2
Configure the drive unit in STARTER.
3
Save the project in STARTER.
4
Go online with the target device in STARTER.
5
Load the project to the target device.
6
The motor starts to run.
DANGER
CAUTION
Activity