Siemens Sinamics S110 Function Manual page 553

Hide thumbs Also See for Sinamics S110:
Table of Contents

Advertisement

E_DIGITAL
MT_ZSW
MTn_ZS_F/MTn_ZS_S
CU_ZSW1
These process data are part of the central process data.
MELDW (message word)
See function diagram [2456]
Table 9- 18
Description of MELDW (message word)
Bit
Meaning
0
Ramp-up/ramp-down
completed/ramp-function generator
active
1
Torque utilization < p2194
Function Manual
Function Manual, 01/2011, 6SL3097-4AB10-0BP3
Remarks
1
Ramp-up/ramp-down completed.
The ramp-up procedure is completed once the
speed setpoint has been changed.
1/0
Ramp-up starts.
The start of the ramp-up procedure is detected as
follows:
The speed setpoint changes,
and
The defined tolerance bandwidth (p2164) is
exited.
0
Ramp-function generator active
The ramp-up procedure is still active once the
speed setpoint has been changed.
0/1
Ramp-up ends.
The end of the ramp-up procedure is detected as
follows:
The speed setpoint is constant,
and
The actual speed value is within the tolerance
bandwidth and has reached the speed setpoint,
and
The delay time (p2166) has elapsed.
1
Torque utilization < p2194
The current torque utilization is less than the set
torque utilization threshold (p2194),
or
Ramp-up is not yet complete.
0
Torque utilization > p2194
The current torque utilization is greater than the
set torque utilization threshold (p2194).
9.2 Communication according to PROFIdrive
Communication
Parameter
BO: r2199.5
BO: r2199.11
551

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents