Loading The Project To The Drive Unit - Siemens Sinamics S110 Function Manual

Hide thumbs Also See for Sinamics S110:
Table of Contents

Advertisement

4.2.8

Loading the project to the drive unit

Introduction
To load the project to the drive unit, proceed as follows:
Steps
1. Click Connect to target system. An ONLINE connection is established and an
Figure 4-7
ONLINE/OFFLINE comparison (example)
2. You changed the data OFFLINE and now have to load it to the target system. Carry out
Function Manual
Function Manual, 01/2011, 6SL3097-4AB10-0BP3
ONLINE/OFFLINE comparison takes place. If any discrepancies are identified, they are
displayed (see screenshot below).
the following:
– <== Download to target device in the "ONLINE/OFFLINE comparison" dialog box
– When the system asks "Are you sure?", click Yes. The system now starts loading the
data.
– When the system informs you that the data was successfully loaded to the target
system, click OK.
– Click OK for "Load from RAM to ROM".
Commissioning with CANopen
4.2 Commissioning
83