TDT RZ2 Manual page 268

System 3 series. rz z series
Table of Contents

Advertisement

6-60
One or more Z-Series headstages can be connected to the input connectors on the
PZ2 back panel. A 5-meter paired fiber optic cable is included to connect the
preamplifier to the base station. The connectors are color coded and keyed to ensure
proper connections. The PZ2 battery charger connects to the round female connector
located on the back panel of the PZ2 preamplifier.
Important!
To avoid introducing EMF noise, DO NOT connect the charger to the PZ2 while
collecting data.
Powering ON
To turn the preamplifier on, move the three position battery switch located on the
front panel of the PZ2, to either the Bat-A or Bat-B position.
Powering OFF
To turn the preamplifier off, move the three position battery switch located on the
front panel of the PZ2, to the OFF position.
Important!
Channels are grouped by 16-channel banks and each bank will only power up when
a headstage is connected. This design helps to increase battery life.
PZ2 Software Control
The preamplifier's hardware operation (power options and indicator LEDs) can be
configured using the PZ2_Control macro within the RPvdsEx control circuits running
on the RZ2 base station.
PZ2 PreAmp
System 3

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RZ2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Related Products for TDT RZ2

Table of Contents

Save PDF