Step 5:Real action:
I/O testing:Toggling Switch, the corresponding reaction of M115 ~ M108 can be observed. In
addition, the signals of output can be also observed (every one second add 1) (Binary display)
AD DA testing:D200 and D201 is around 2 times of D300, and keep increasing; D202 and D203 is
around 2 times of D301, and keep decreasing.
This light signal increase
by 1number per second.
16-145
Chapter 16 PLC Function C2000 Series
WPL will be modified
when pressing this Switch