FRU Removal and Replacement
1
Figure 79: SBAR assembly removal and replacement
6. Using the handles, pull the SBAR assembly out of the director chassis.
7. Place the SBAR assembly in an antistatic bag to provide ESD protection.

Replacing the SBAR Assembly

To replace a redundant SBAR assembly:
1. Remove the replacement SBAR assembly from its protective antistatic bag.
2. Inspect the PWA side of the SBAR assembly for bent or broken connector
3. Orient the SBAR assembly, as shown in
4. Close both handles.
5. Disconnect the ESD wrist strap from the director chassis and your wrist.
6. Inspect the assembly to ensure the amber LED is extinguished. If the amber
7. Replace the RFI shield.
248
1
SBAR assembly
Support the assembly with one hand when performing this step.
pins that may have been damaged during shipping. If any pins are damaged,
obtain a new assembly.
the director chassis guide, then push the assembly toward the backplane to
engage the connector pins. Verify the assembly is flush and even with the
other SBAR assembly in the director.
LED is illuminated, go to
problem.
Figure
"MAP 0000: Start
MAP" on page 45 to isolate the
79. Insert the assembly into
Director 2/140 Service Manual

Advertisement

Table of Contents
loading

Table of Contents