HP storageworks director 2/140 Service Manual page 70

Hide thumbs Also See for storageworks director 2/140:
Table of Contents

Advertisement

Diagnostics
Was a corrective action performed?
YES
4
Verify redundant power supply operation.
1. Inspect the power supply and ensure the green PWR OK LED illuminates
2. At the Hardware View, observe the graphic representing the power supply
Is a failure indicated?
YES
5
Ensure the indicated power supply is correctly installed and seated in the director.
If required, partially remove and reseat the power supply.
Was a corrective action performed?
YES
6
Verify redundant power supply operation.
1. Inspect the power supply and ensure the green PWR OK LED illuminates
2. At the Hardware View, observe the graphic representing the power supply
Is a failure indicated?
YES
70
NO
Go to
step
5.
and all amber LEDs extinguish.
and ensure a failure symbol (blinking red and yellow diamond) does not
display.
NO
The director is operational. Exit MAP.
NO
Go to
step
7.
and all amber LEDs extinguish.
and ensure a failure symbol (blinking red and yellow diamond) does not
display.
NO
The director is operational. Exit MAP.
Director 2/140 Service Manual

Advertisement

Table of Contents
loading

Table of Contents