Toyota T100 1996 Service Manual page 850

1996 toyota t100
Table of Contents

Advertisement

EM−22
1996 TOYOTA T100 (RM449U)
ENGINE MECHANICAL (5VZ−FE)
10.
(a)
(b)
(c)
(d)
(e)
P20839
(f)
(g)
P20832
11.
(a)
(b)
(c)
P08325
(d)
P10221
TIMING BELT
INSTALL RH CAMSHAFT TIMING PULLEY AND TIM-
ING BELT
Remove any oil or water on the RH camshaft timing and
No.2 idler pulleys, and keep them clean.
Align the installation mark on the timing belt with the tim-
ing mark of the RH camshaft timing pulley as shown.
Hang the timing belt on the RH camshaft timing pulley.
Align the timing marks of the RH camshaft timing pulley
and No.3 timing belt cover.
Slide the RH camshaft timing pulley on the camshaft.
Using SST, align the knock pin hole of the camshaft with
the knock pin groove marked R of the pulley and install the
knock pin.
SST
09960−10010 (09962−01000, 09963−01000)
Using SST, install and torque the bolt.
SST
09960−10010 (09962−01000, 09963−01000)
Torque: 110 N·m (1,100 kgf·cm, 81 ft·lbf)
SET TIMING BELT TENSIONER
Using a press, slowly press in the push rod using 100 −
1,000 kg (220 − 2,205 lb, 981 − 9,807 N) of pressure.
Align the holes of the push rod and housing, pass a 1.5
mm hexagon wrench through the holes to keep the set-
ting position of the push rod.
Release the press.
Install the dust boot to the tensioner.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents