Toyota T100 1996 Service Manual page 743

1996 toyota t100
Table of Contents

Advertisement

EM−20
Aligin
Aligin
P15080
1996 TOYOTA T100 (RM449U)
ENGINE MECHANICAL (3RZ−FE)
INSTALLATION
NOTICE:
Check that No.1 cylinder is at TDC and that the weights of
the No.1 and No.2 balance shafts are at the bottom side.
1.
Install the No.4 damper with the 2 bolts.
P14962
2.
(a)
(b)
Aligin
(c)
(d)
P15101
(e)
P15100
3.
NOTICE:
Assemble the chain tensioner with the pin installed, then
remove the pin after assembly.
When doing this, avoid pushing the No.2 vibration damper
against the chain.
(a)
A03755
TIMING CHAIN
INSTALL NO.4 VIBRATION DAMPER
INSTALL NO.2 TIMING CHAIN
Install the No.2 timing chain by matching its mark links
with the timing marks on the No.2 crankshaft timing
sprocket and balance shaft timing sprocket.
Fit the other mark link of No.2 timing chain onto the
sprocket behind the large timing mark of the balance shaft
drive gear.
Insert the balance shaft drive gear shaft through the bal-
ance shaft drive gear so that it fits into the thrust plate
hole.
Then align the small timing mark of the balance shaft drive
gear with the timing mark of the balance shaft timing gear.
Install the bolt to the balance shaft drive gear and tighten
it.
Torque: 25 N·m (250 kgf·cm, 18 ft·lbf)
Check that each timing mark is matched with the corre-
sponding mark link.
INSTALL NO.2, NO.3 VIBRATION DAMPERS AND
NO.2 CHAIN TENSIONER
Install the No.2 chain tensioner with the nut.
Torque: 18 N·m (185 kgf·cm, 13 ft·lbf)
EM073−03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents