Option
A specific outlet
number
A comma- separated
list of outlets
A range of outlets with
a hyphen in between
If you entered the command without "/y", a message appears, prompting you to confirm the operation.
Then:
•
•
Type y to confirm the operation, OR
•
•
Type n to abort the operation
If you have configured outlet switching sequence and/or delay, PRO4X will prompt you with one more
question:
Should outlet sequence order and delays be used during switching?
•
•
Type y to apply the current outlet sequence and delay settings when switching on outlets. See
Setting Outlet Power-On Sequence and Delay.
•
•
Type n to apply the default sequence and delays.
Canceling the Power-On Process
This section applies to outlet-switching capable models only.
After issuing the command to power on ALL outlets, you can use the following command to stop the
power-on process.
#
power cancelSequence
To quicken the operation, you can add the parameter "/y" to the end of the command, which confirms
the operation.
#
power cancelSequence /y
Example - Power Cycling Specific Outlets
The following command power cycles these outlets: 2, 6, 7, 8, 10, 13, 14, 15 and 16.
526
Description
Power cycles the specified outlet.
Power cycles multiple, inconsecutive or consecutive
outlets.
For example, to specify 7 outlets -- 2, 4, 9, 11, 12, 13 and
15, type:
outlets 2,4,9,11-13,15.
Power cycles multiple, consecutive outlets.
For example, to specify 6 consecutive outlets -- 3, 4, 5, 6,
7, 8, type:
outlets 3-8.
Need help?
Do you have a question about the Server Technology PRO4X and is the answer not in the manual?