Sequence Setup

By default, outlets are sequentially powered on in the ascending order from outlet 1 to the final when
turning ON or power cycling all outlets. You can change the order in which the outlets power ON. This is
useful when there is a specific order in which some IT equipment should be powered up first.
In addition, you can make a delay occur between two outlets that are turned on consecutively. For
example, if the power-on sequence is Outlet 1 through Outlet 8, and you want to wait for 5 seconds
before turning on Outlet 4, after Outlet 3 is turned on, assign a delay of 5 seconds to Outlet 3.
To set the outlet power-on sequence and delay:
1) On the Outlets page, click
2) Select one or multiple outlets by clicking them one by one in the 'Outlet' column.
3) Click the arrow buttons to change the outlet positions.
4) Click the 'Delay' column of the outlet that requires a wait after it is turned on.
5) Type a new value in seconds.
6) Click Save.
144
Default value
80% of OCP rating
65% of OCP rating
1A
Default value
30mA
15mA
> Sequence Setup.