▶
To release a link unit from the Primary Unit's web interface:
Note: If a release action is attempted on a link unit when the unit is an unreachable state, a warning
message displays, and the primary will not recognize the link unit.
1) From the PDU page, in the Link Units section, click a link unit to select it.
2) Click Release Link Unit.
3) A confirmation prompts to cancel or release.
If released, the link unit is removed from the page.
Switching to a Different Unit
Switching your view to a different unit is a control function noted by the Switch control in the upper left
corner of the pages that display primary and link unit information.
Displayed data in the GUI defaults to the primary unit. The Switch control allows you to switch from a
primary page to a link unit page, and back again to the primary.
43
Need help?
Do you have a question about the Server Technology PRO4X and is the answer not in the manual?