Fujitsu PRIMEQUEST 500A Series Installation Manual page 383

Table of Contents

Advertisement

C.1.2
Power-on and power-off procedures for the entire system
C.1.2.1 Power-on procedure for the entire system
Remarks: The procedures described below show sample screenshots of windows
Procedure
1
Switch on the power switches on the MMB and peripherals.
2
Log in to MMB Web-UI.
The MMB Web-UI window is displayed.
3
Click [System]
The [System Power Control] window is displayed.
4
Click [Power On all partition(s)] or [Power On the Chassis only] (only for the
PRIMEQUEST 580A/540A/580/540/480/440), and click the [Apply] button.
System power is turned on.
Remarks: If [Power On all partition(s)] is selected while only cabinet power is
C122-E001-10EN
displayed for the PRIMEQUEST 580A/540A/580/540/480/440.
[System Power Control] from the MMB menu.
Figure C.5 [System Power Control] window
on, power to every partition is turned on.
If [Power On the Chassis only] is selected, power to components
other than the system board (SB) and IO Unit is turned on (this
includes power to the GSWB).
C.1 Power-On/Off Procedures for the Main Unit
C-9

Advertisement

Table of Contents
loading

Table of Contents