Fujitsu PRIMEQUEST 520A Installation Planning Manual
Fujitsu PRIMEQUEST 520A Installation Planning Manual

Fujitsu PRIMEQUEST 520A Installation Planning Manual

Hide thumbs Also See for PRIMEQUEST 520A:
Table of Contents

Advertisement

Quick Links

PRIMEQUEST 520A/520/420
Installation Planning Manual
(errata 2008/09/19 and 2008/12/18 incorporated)
Edition April 2008

Advertisement

Table of Contents
loading

Summary of Contents for Fujitsu PRIMEQUEST 520A

  • Page 1 PRIMEQUEST 520A/520/420 Installation Planning Manual (errata 2008/09/19 and 2008/12/18 incorporated) Edition April 2008...
  • Page 2: Copyright And Trademarks

    There you will also find the addresses of the relevant User Documentation Department. Copyright and Trademarks Copyright © FUJITSU LIMITED and Fujitsu Technology Solutions GmbH 2006 - 2009. All rights reserved. Delivery subject to availability; right of technical modifications reserved.
  • Page 3 Recycling old computer equipment is already a tradition at Fujitsu Technology Solutions: We have been redeeming and reusing old computer systems for many years now. Even at the design stage, particular emphasis is placed on the reusability of components and materials.
  • Page 4 You can also submit complaints via the internet: http://abgadwda.abg.fsc.net/RLC/ Email: RLC@ts.fujitsu.com In case of a technical problem with Fujitsu Technology Solutions products, or If you have questions on setup or operation: our technical support specialists can offer fast and competent assistance: http://www.ts.fujitsu.com/support/helpdesk.html...
  • Page 5 Dieses Gerät ist entsprechend der europäischen Richtlinie 2002/96/EG über Elektro- und Elektronikaltgeräte (waste electrical and electronic equipment - WEEE) gekennzeichnet. Die Richtlinie gibt den Rahmen für eine EU-weit gültige Rücknahme und Verwertung der Altgeräte vor. This appliance is labelled in accordance with European Directive 2002/96/EG concerning used electrical and electronic appliances (waste electrical and electronic equipment - WEEE).
  • Page 6 2002/96/ (waste electrical and electronic equipment – WEEE). Alat ini bersesuaian dengan garis panduan Eropa 2002/96/EG tentang alat-alat tua elektrik dan elektronik (waste electrical and electronic equipment - WEEE) . Garis panduan tersebut memberi rangka rujukan yang berlaku di seluruh Eropa untuk penerimaan balik dan penggunaan alat-alat tua.
  • Page 7 The effect of temperature on the reliability of IT installations High ambient temperatures and the associated high component temperatures have a deleterious effect on all technical products and thus also on IT installations. The following areas are particularly affected: • Functionality The propagation time of electrical signals increases with temperature.
  • Page 8 The effect of temperature on the reliability of IT installations Installation instructions IT installations are generally designed in such a way that cooling air is drawn in through the door at the front and the warmed air expelled through the back of the system cabi- net.
  • Page 9 The effect of temperature on the reliability of IT installations Sketch of the cooling function Air outlet Ceiling Air intake Floor ( false floor ) U41644-J-Z816-5-76 TEMPERATURE 3...
  • Page 10 The effect of temperature on the reliability of IT installations Checklist for cooling-related malfunctions Temperature of the input air (room temperature) is too high (desired temperature < 25 °C, maximum value < 32 °C) Measuring points The temperature should be measured at two places within the air intake area at the front of the system: 1.
  • Page 11: About This Product

    Keep this manual handy for further reference. Fujitsu and Fujitsu Technology Solutions make every effort to prevent users and bystanders from being injured or from suffering damage to their property. Use the product according to this manual.
  • Page 12: Laufende K/F

    Laufende K/F 2 RADIO FREQUENCY INTERFERENCE STATEMENT The following notice is for EU users only. WARNING: This is a product which meets Class A of EN55022. In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures.
  • Page 13 (™) or registered trademark (®) symbols. The contents of this manual shall not be disclosed in any way or reproduced in any media without the express written permission of Fujitsu Limited or Fujitsu Technology Solutions GmbH. All Rights Reserved, Copyright FUJITSU LIMITED and Fujitsu Technology...
  • Page 15: Revision History

    Appendix A.1 (Altered) • Addition of description for the pull-out stabilizer and total revision Appendix A.1.2 (Added) • Addition of conditions for mounting in non- Fujitsu racks 2006-08-11 Entire manual • Addition of the information about (Added/Altered) PRIMEQUEST 520 • Correction of illustrations due to change in specifications for the stabilizer •...
  • Page 16 Fujitsu Technology Solutions’ order numbers in manual references, changes the description where the PRIMEQUEST manuals are available, adds the specification and shape of the IEC 60309 power strip plugs used by Fujitsu Technology Solutions, refers to the documentation for Fujitsu Technology Solutions’ PRIMECENTER racks, deletes Fujitsu specific rack descriptions (section “A.2...
  • Page 17: Chapter 3 Precautions Pertaining To Delivery And Installation

    Preface This manual describes requirements and concepts for installation and facility planning for the PRIMEQUEST 520A*/520/420. Installation and facility planning should be performed together with your assigned Fujitsu representatives according to the instructions provided in this manual. This manual is intended for persons introducing and planning the installation of a PRIMEQUEST server, or those who manage server operations.
  • Page 18: Conventions For Alert Messages

    Installation Manual (U41632-J-Z816-x-76/C122-E001EN) and see the related manuals: • SPARC Enterprise/PRIMEQUEST Installation Planning Manual (U41296-J-Z816-x-76/C120-H007EN) • PRIMEQUEST 520A/520/420 System Design Guide (U41643-J-Z816-x-76/C122-B009EN) Environmental Requirements for Using This Product This product is a general-purpose computer intended for use in a computer room.
  • Page 19 Laufende K/F 1 Reader Feedback • The Remote Customer Support System (REMCS) is not supported in Europe. • In this manual, it is assumed that two BMMs (optional products) can be connected to a single I/O unit and IOX; this is reflected both in the explanations and in the figures included in this manual. At present, however, the PRIMEQUEST 420 series supports only connection to one BMM (BMM#0) per I/O unit and IOX.
  • Page 21: Table Of Contents

    2.4 Input Power Supply Unit Connections ......2-31 2.4.1 PRIMEQUEST 520A/520/420 main unit ..... 2-31 2.4.2 PCI_Box .
  • Page 22 A.2 Rack Mounting ..........A-1 A.2.1 Conditions for mounting in Fujitsu 19-inch global racks ..
  • Page 23 1-13 Figure 1.5 Cooling air and exhaust flows of the PRIMEQUEST 520A/520/420 main unit ....1-14 Figure 1.6 Cooling air and exhaust flows of the PCI_Box ....
  • Page 24 Contents Figure 2.18 Characteristics of circuit breakers in customers' distribution panels installed in Japan ... . . 2-36 Figure 2.19 Characteristics of circuit breakers in customers' distribution panels installed outside Japan ....... . . 2-37 Figure A.1 Pull-out stabilizer .
  • Page 25 Table 2.3 AC cable specifications for the PRIMEQUEST 520A/520/420 main unit ..........
  • Page 27: Table 1.1 Units And Their Specifications

    Each PCI unit has three PCI slots, and each PCI Express unit has two PCI Express slots. PCI Express units can be connected to only the PRIMEQUEST 520A*/520 main unit, and up to two units can be connected. Remarks: Units listed in Table 1.1...
  • Page 28: Figure 1.1 Configuration Of The Primequest 520A/520/420 Main Unit

    (optional) is required in addition to the standard power distribution box. For dual power feed in the PRIMEQUEST 520A*/520/420, a Dual Power Feed Option is required. The Dual Power Feed Option is equipped with one 200-V power distribution box.
  • Page 29: Figure 1.2 External View Of The Primequest 520A/520/420 Main Unit

    The following figures show different views of the units: External view of the PRIMEQUEST 520A/520/420 main unit (Figure 1.2) External view of the PCI_Box (Figure 1.3) Figure 1.2 External view of the PRIMEQUEST 520A*/520/420 main unit *: not supported by Fujitsu Technology Solutions U41644-J-Z816-5-76...
  • Page 30: Figure 1.3 External View Of The Pci_Box

    Laufende K/F 2 Figure 1.3 External view of the PCI_Box U41644-J-Z816-5-76...
  • Page 31: Table 1.2 Primequest 520A/520 Main Unit Installation Specifications (Model Name: Mc3B0R211X)

    Laufende K/F 1 Installation Specifications The following tables list the installation specifications for the units: PRIMEQUEST 520A/520 main unit installation specifications (Model name: MC3B0R211x) (Table 1.2) PRIMEQUEST 420 main unit installation specifications (Model name: MC3A0R111x) (Table 1.3) PCI_Box installation specifications (Model name: MC-07PBa1x) (Table 1.4)
  • Page 32 Laufende K/F 2 Item Value Air conditioning Noise [dB (A)] (*6) (*8) Sound power level [B (A)] (*6) (*8) Allowable Operating (including standby) 2.5 (Synthetic vibration seismic vibration) Not operating (*5) 4.0 (Synthetic [m/s seismic vibration) 0.15 Allowable dust [mg/m 200 to 240 VAC ±...
  • Page 33 Laufende K/F 1 The temperature requirement depends on the installation altitude. - 5 to 35 °C (41 to 95.0 °F) [if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)] - 5 to 33 °C (41 to 91.4 °F) [if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)] - 5 to 32 °C (41 to 89.6 °F) [if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]...
  • Page 34: Table 1.3 Primequest 420 Main Unit Installation Specifications

    Laufende K/F 2 Table 1.3 PRIMEQUEST 420 main unit installation specifications (Model name: MC3A0R111x) Item Value Dimensions Width 482 (18.98) [mm (in.)] Depth (*1) 820 (32.28) Height 530 (20.87) Weight [kg (lb)] (*2) 150 (330) Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] 10620 (10066) Exhaust air flow (*8) With fans operating at...
  • Page 35 Laufende K/F 1 This value does not include any projection. Value for the case with the maximum number of optional units allowed installed. Value not including the rack-mounting rails and cable management. The weight of the unit based on the equipment configuration can be calculated from the following formula: Unit weight = 103 + (11 x A) + (17 x B) + (4 x C) + (4 x D) A = Number of SBs mounted:...
  • Page 36: Table 1.4 Pci_Box Installation Specifications (Model Name: Mc-07Pba1X)

    Laufende K/F 2 Table 1.4 PCI_Box installation specifications (Model name: MC-07PBa1x) Item Value Dimensions Width 482 (18.98) [mm (in.)] Depth (*1) 768 (30.24) Height 174 (6.85) Weight [kg (lb)] (*2) 42 (92) Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] 2550 (2416.9) Exhaust air flow (*7) With fans operating at 4.49 (158.6)
  • Page 37 Laufende K/F 1 This value does not include any projection. Value for the case the maximum allowable number of optional units is mounted. Value not including the rack-mounting rails and cable management. There must be no condensation. The temperature requirement depends on the installation altitude. - 5 to 35 °C (41 to 95.0 °F) [if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)] - 5 to 33 °C (41 to 91.4 °F)
  • Page 38: Table 1.5 Expansion File Unit Installation Specifications (Model Name: Mc-03F111X)

    Laufende K/F 2 Table 1.5 Expansion file unit installation specifications (Model name: MC-03F111x) Item Value Dimensions Width 483 (19.01) [mm (in.)] Depth (*1) 646 (25.43) Height 133 (5.23) Weight [kg (lb)] (*2) 34 (74.8) Air conditioning Maximum heat dissipation (in steady state) 1098 (1040.7) [kJ/Hr (BTU/h)] Temperature...
  • Page 39: Figure 1.4 Service Area For The Primequest 520A/520/420 Main Unit

    [end of addition according to manual errata 2008/12/18] Equipment Floor Plan This section shows the installation area and the service area when the PRIMEQUEST 520A*/520/420 is installed in the Fujitsu 19-inch global rack. Refer to A.1, "Where you can find information on PRIMECENTER racks"...
  • Page 40: Figure 1.5 Cooling Air And Exhaust Flows Of The Primequest 520A/520/420 Main Unit

    Laufende K/F 2 Cooling Air and Exhaust Flows This section explains the cooling air and exhaust flows of each cabinet. Cooling air and exhaust flows of the PRIMEQUEST 520A/520/420 main unit (Figure 1.5) Cooling air and exhaust flows of the PCI_Box (Figure 1.6)
  • Page 41: Figure 1.6 Cooling Air And Exhaust Flows Of The Pci_Box

    Laufende K/F 1 Figure 1.6 Cooling air and exhaust flows of the PCI_Box U41644-J-Z816-5-76 1-15...
  • Page 43: Chapter 2 Connection Reference

    CHAPTER 2 Connection Reference This chapter provides cable connection diagrams and lists of the applicable cables. Connection Overview Figure 2.1 shows an overview of equipment cable connections: U41644-J-Z816-5-76...
  • Page 44: Figure 2.1 Equipment Cable Connections (1/2)

    Laufende K/F 2 PRIMEQUEST 520A/520/420 series main unit PCI card type: IOU (*1) - LAN interface PCI-X card (x4) - SCSI interface - Fibre Channel PCI Express card Fibre Channel (x4 or x2) (*2) BMC module (x2) USB1.1/2.0 equipment USB2.0 (x2)
  • Page 45 The PCI_Box includes neither a PCIU nor a PEXU. At least one of those units must be prepared. Up to two PEXUs can be connected to the PRIMEQUEST 520A*/520 main unit. PEXUs are connected by PCI unit cables (combination of CH#0/#1 and CH#2/#3 on the main unit side).
  • Page 46: Signal Cable Connections

    This section provides diagrams of signal-cable connections, lists of applicable cables, and notes on cabling. Basic interfaces and peripherals (Section 2.2.1) LAN and other device connections (Section 2.2.2) Notes on cabling PRIMEQUEST 520A/520/420 (Section 2.2.3) Details of external interface connection ports (Section 2.2.4) 2.2.1 Basic interfaces and peripherals Figure 2.2...
  • Page 47: Figure 2.2 Interface Cable Connections (Basic Interfaces And Peripherals)

    Laufende K/F 1 (1) Cable connection diagram PRIMEQUEST 520A/520/420 series main unit MMB (1 unit) COM (1 port) Console Uninterruptible Connector type: D-Sub 9 Pin male To *1 power supply (F987****) LAN (3 ports) (1) (2) Connector type: RJ45 Uninterruptible...
  • Page 48: Table 2.1 Cable List (Basic Interface And Peripherals)

    (2) Cable list When determining the total length of the external interface cable to be connected to the PRIMEQUEST 520A*/520/420, allow for an extra length of cable for pulling out the units. Table 2.1 Cable list (basic interface and peripherals)
  • Page 49 Laufende K/F 1 Length Outside Name Order code Packaging Japan Japan [m (ft.)] SCSI cable Optional: Select 5 or 10 m. 5 (16) DCBL-SCN05 VHDCI 68-pin, male to 10 (33) HIDEC 68-pin, male DCBL-SCN10 RS232C cable (Dsub- FMV-CBL501 1.5 (5) 9Pin-9Pin, cross cable) PCI_Box CTL cable (CA78005-0053)
  • Page 50: Figure 2.3 Cable Connections (Lan And Other Device Connections)

    Figure 2.3 shows the cable connections for a LAN and other device connections. Table 2.2 lists the applicable cables. (1) Cable connection diagram PRIMEQUEST 520A/520/420 Fibre channel switch series Connector type: Duplex SC or Duplex LC Fibre Channel card (2G)
  • Page 51: Table 2.2 Cable List (Lan And Other Device Connection)

    (2) Cable list When determining the total length of the external interface cable to be connected to the PRIMEQUEST 520A*/520/420, allow for an extra length of cable for pulling out the units. Table 2.2 Cable list (LAN and other device connection)
  • Page 52 Laufende K/F 2 Outside Length Name Order code Japan Packaging Japan [m (ft.)] (3) Twisted pair cable TPCBL-B005 Optional: Select 5, 10, 15, 5 (16) (category 5 UTP cable) 30, 50, or 100 m. TPCBL-B010 10 (33) This cable is required if TPCBL-B015 15 (49) 100Base-TX or 10Base-T...
  • Page 53: Notes On Cabling Primequest 520A/520/420

    When determining the total length of the cable to be connected to the PRIMEQUEST 520A*/520/420, allow for an extra length of cable for pulling out the units. PRIMEQUEST 520A*/520/420 needs to be pulled out from the rack for maintenance. The cable is routed with the cable-management system. For the cable-management system, extra cable length of 2 m (6.6 ft.) is required.
  • Page 54: Details Of External Interface Connection Ports

    This section shows the locations of the external interface connection ports of PRIMEQUEST 520A*/520/420. Take these locations into account when calculating the excess lengths of connection cables. External interface connection ports in the PRIMEQUEST 520A*/520 main unit (Figure 2.4) External interface connection ports in the PRIMEQUEST 420 main unit (Figure 2.5)
  • Page 55: Figure 2.4 External Interface Connection Ports

    Laufende K/F 1 (1) PRIMEQUEST 520A*/520 main unit Note: The above unit contains a Dual Power Feed Option. Figure 2.4 External interface connection ports in the PRIMEQUEST 520A*/520 main unit *: not supported by Fujitsu Technology Solutions U41644-J-Z816-5-76 2-13...
  • Page 56: Figure 2.5 External Interface Connection Ports In The Primequest 420 Main Unit

    Laufende K/F 2 (2) PRIMEQUEST 420 main unit Note: The above unit contains a Dual Power Feed Option. Figure 2.5 External interface connection ports in the PRIMEQUEST 420 main unit 2-14 U41644-J-Z816-5-76...
  • Page 57: Figure 2.6 External Interface Ports In The Pci_Box

    Laufende K/F 1 (3) PCI_Box Figure 2.6 External interface ports in the PCI_Box U41644-J-Z816-5-76 2-15...
  • Page 58: Power Cable Connections

    Power Cable Connections This section provides diagrams of the input power system for the PRIMEQUEST 520A*/520/420 and the PCI_Box. Input power system diagram for the PRIMEQUEST 520A*/520/420 (Section 2.3.1) Input power system diagram for the PRIMEQUEST 520A/520/420 including peripherals (Section 2.3.2)
  • Page 59: Figure 2.7 Input Power System Diagram For The Primequest 520A/520/420 (Standard Configuration)

    (1) Standard configuration for use in Japan (including single power feed system and redundant power supply unit) This section shows the input power system in the standard PRIMEQUEST 520A*/ 520/420 configuration for use in Japan (including a single power feed option and redundant power supply unit).
  • Page 60: Figure 2.8 Input Power System Diagram For The Primequest 520A/520/420

    For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics." Figure 2.8 Input power system diagram for the PRIMEQUEST 520A*/520/420 (dual power feed configuration) *: not supported by Fujitsu Technology Solutions 2-18...
  • Page 61: Figure 2.9 Input Power System Diagram For The Primequest 520A/520/420

    (3) Standard configuration for outside Japan (general) (including single power feed system and redundant power supply unit) This section shows the input power system in the standard PRIMEQUEST 520A*/ 520/420 configuration for outside Japan (general) (including a single power feed option and redundant power supply unit).
  • Page 62: For Outside Japan (General) (Dual Power Feed Configuration)

    For information about the circuit breakers on the customer’s distribution panel, see Section 2.6, "Circuit Breaker Characteristics." Figure 2.10 Input power system diagram for the PRIMEQUEST 520A*/520/ 420 for outside Japan (general) (dual power feed configuration) *: not supported by Fujitsu Technology Solutions...
  • Page 63: Including Peripherals

    Input power system diagram for the PRIMEQUEST 520A*/520/ 420 including peripherals The figures in this section show the input power system diagrams for the PRIMEQUEST 520A*/520/420 when the PCI_Box and expansion file unit are connected. Single power feed configuration for use in Japan (including a redundant power supply unit) (Figure 2.11)
  • Page 64: 420 Including The Peripherals In A Single Power Feed Configuration

    (1) Single power feed configuration for use in Japan (including a redundant power supply unit) Figure 2.11 shows the input power system diagram of the PRIMEQUEST 520A*/520/ 420 connected with the PCI_Box and expansion file unit in a single power feed configuration (including a redundant PSU) for use in Japan.
  • Page 65 Laufende K/F 1 Power cables (Input#0 to Input#2) of the main unit (PRIMEQUEST 520A*/ 520/420) are connected to PSUs (PSU#0 to PSU#2) as shown below, on a one-to-one basis. Each power cable is connected to each output group (including one overcurrent protector and two outlets) of the outlet box on a one-to-one basis.
  • Page 66: Including The Peripherals In A Dual Power Feed Configuration For Use In Japan (1/2)

    (2) Dual power feed configuration for use in Japan Figure 2.12 shows an input power system diagram of the PRIMEQUEST 520A*/520/ 420 connected with the PCI_Box and expansion file unit in a dual power feed configuration for use in Japan.
  • Page 67 Laufende K/F 1 Power cables (Input#0 to Input#3) of the main unit (PRIMEQUEST 520A*/ 520/420) are connected to PSUs (PSU#0 to PSU#3) as shown below, on a one-to-one basis. Each power cable is connected to each output group (including one overcurrent protector and two outlets) of the outlet box on a one-to-one basis.
  • Page 68: Including The Peripherals In A Single Power Feed Configuration (Including A Redundant Psu) For Use Outside Japan (General)

    (3) Single power feed configuration (including a redundant PSU) for use outside Japan (general) Figure 2.13 shows the input power system diagram of the PRIMEQUEST 520A*/ 520/420 connected with the PCI_Box and expansion file unit in a single power feed configuration (including a redundant PSU) for use outside Japan (general).
  • Page 69 Laufende K/F 1 Power cables (Input#0 to Input#2) of the main unit (PRIMEQUEST 520A*/ 520/420) are connected to PSUs (PSU#0 to PSU#2) as shown below on a one-to-one basis. For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."...
  • Page 70: 420 Including The Peripherals In A Dual Power Feed Configuration For Use

    (4) Dual power feed configuration for use outside Japan (general) Figure 2.14 shows the input power system diagram of the PRIMEQUEST 520A*/ 520/420 connected with the PCI_Box and expansion file unit in a dual power feed configuration for use outside Japan (general).
  • Page 71 Laufende K/F 1 Power cables (Input#0 to Input#3) of the main unit (PRIMEQUEST 520A*/ 520/420) are connected to PSUs (PSU#0 to PSU#3) as shown below on a one-to-one basis. For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."...
  • Page 72: Figure 2.15 Power Distribution Box (For Use In Japan)

    (total current for four output groups) is 24 A. Power cables of the PRIMEQUEST 520A*/520/420 and the PCI_Box are connected to each output group on a one-to-one basis. The overcurrent protector (CB) protects each output group only. When power cables are connected to two outlets of an output group, be careful not to exceed the maximum rated current of the group.
  • Page 73: Outside Japan (General) (1/2)

    2.4.3) 2.4.1 PRIMEQUEST 520A*/520/420 main unit Table 2.3 lists the specifications for connecting the input power supply unit to the PRIMEQUEST 520A*/520/420 main unit. Table 2.3 AC cable specifications for the PRIMEQUEST 520A*/520/420 main unit Destination Plug type Remarks JAPAN...
  • Page 74: Pci_Box

    (PRIMEQUEST 520A*/520/420). *: not supported by Fujitsu Technology Solutions Note: Use the supplied accessory AC cable to connect the main unit. Do not use the accessory AC cable for other products.
  • Page 75: Table 2.5 Specifications Of The Ac Cables Between The Power Distribution Box

    Denki) Outside Japan NEMA L6-30P NEMA L6-30R (North America only) 30A, 220 VAC Fujitsu Technology IEC60309 (32A) Solutions only Note: Use the supplied accessory AC cable to connect the main unit. Do not use the accessory AC cable for other products.
  • Page 76: Figure 2.17 Ac Cable Connection Under A Free-Access Floor

    Outlet Outlet Unit: mm (in.) Remark 1: This drawing shows the Fujitsu 19-inch global rack with the main unit as an example. Remark 2: Values in ( ) are in inches. Figure 2.17 AC cable connection under a free-access floor...
  • Page 77: Figure

    Figure 2.18. *: not supported by Fujitsu Technology Solutions If breakers other than those specified above are used, they may be tripped at the occurrence of a device-internal short circuit, which in turn may cause the entire device to shut down.
  • Page 78 Laufende K/F 2 Maximum 0.06 0.04 Minimum 0.02 0.01 5 6 7 8 10 15 20 30 40 50 80 100 Current (ratio to the rated current) Figure 2.18 Characteristics of circuit breakers in customers' distribution panels installed in Japan 2-36 U41644-J-Z816-5-76...
  • Page 79: Installed Outside Japan

    "C" or "D" characteristics II) shown in Figure 2.19. (IEC898 or DIN 0641 Part II) shown in Figure 2.19. *: not supported by Fujitsu Technology Solutions 0.06 0.04 0.02 0.01 4 5 6 7 8 10 30 40 50...
  • Page 81: Table 3.1 Elevator Load Requirements

    CHAPTER 3 Precautions Pertaining to Delivery and Installation This chapter contains precautions regarding delivery and installation of the equipment. Elevator Load Requirements The equipment is wider than a typical server system. To load this equipment on an elevator, you may need to remove side panels and/or doors. Before loading equipment mounted in an expansion rack onto an elevator, see the elevator load requirements listed in Table...
  • Page 82: Earthquake Preparedness Measures

    Earthquake preparedness measures are intended to prevent computers from falling over, to ensure the safety of operators, to prevent damage, and to enable the quick recovery of systems. Fujitsu has standardized the following techniques to prevent damage to computer systems resulting from an earthquake.
  • Page 83: Appendix A Racks

    Mounting". That section assumes that the PRIMEQUEST 520/420 is normally installed in a rack manufactured by Fujitsu Ltd., but it can be read as conceptual information for using any other rack. A detailed description for installing a PRIMEQUEST 520/420 in a PRIMECENTER rack is part of the maual PRIMEQUEST 520/420 Installation Instructions (U41658-J- Z816-x-76) edited by Fujitsu Technology Solutions.
  • Page 84: Table A.1 Recommended Number Of Units To Be Mounted In Racks

    This section describes the conditions for unit mounting in the 19-inch global racks manufactured by Fujitsu. Two types of Fujitsu 19-inch global rack are available: one type has a stabilizer for preventing the rack from toppling, and the other type does not have it (the rack is designed to be secured to the floor).
  • Page 85: Pull-Out Stabilizer

    (see Figure A.1). To perform maintenance work or add an optional unit, pull out the pull-out stabilizer forward before pulling out the PRIMEQUEST 520A*/520/420 unit, as shown in Figure A.1. Note: A rack without the stabilizer must always be secured to the floor even if the number of mounted units in the rack is less than the recommended number or the mounting height is lower than the recommended height of 24U.
  • Page 86: Securing The Rack With Bolt Stabilizers

    The pull-out stabilizer supplied as standard is not required if the rack is secured with leveling feet. However, in consideration of the possibility that the racks will be moved in the future, Fujitsu recommends jointly using the standard pull-out stabilizers. In cases where the pull-out stabilizer is not used, store it in a safe place in case the racks are moved in the feature.
  • Page 87: Cable Route

    Figure A.3 Securing a rack with leveling feet (2) Cable route inside the rack The PRIMEQUEST 520A*/520/420 is equipped with a cable management system as standard equipment designed for mounting in a Fujitsu 19-inch global rack. By controlling cable slack with the cable management system, the PRIMEQUEST 520A*/520/420 unit can easily be pulled out from the rack while cables remain connected.
  • Page 88 Figure A.4 Cable route (3) Other conditions The Fujitsu 19-inch global rack comes with blank panels for covering the front of unused space where no unit is mounted. If warm exhaust air from the PRIMEQUEST 520A*/520/420 unit flows to the front and reenters the unit, it may trigger a temperature alarm and cause a problem.
  • Page 89: Table A.2 Rack Installation Flow

    Laufende K/F 1 If earthquake preparedness measures do not include securing the rack to the floor In this method, the installed rack can withstand an acceleration force of up to 20 gal in a general-use building during an earthquake. The stabilizer mounted to the rack is used to prevent the rack from toppling, such as during maintenance of mounted units.
  • Page 90 Appendix A Racks 1. Considering requirements 3. Selecting a for securing a rack with 4. Preparing the 2. Selecting a rack method of earthquake preparedness required options securing the rack measures taken Rack not secured to the floor Rack with the stabilizer - (*1),(*2) None •...
  • Page 91: Conditions For Mounting In Another Company's Rack

    Fujitsu. If the PRIMEQUEST 520A*/520/420 is mounted not in a Fujitsu 19-inch global rack but in another type of rack such as a rack manufactured by another company, validation (verification of cooling in the rack and the rack strength) cannot be performed and operation cannot be guaranteed.
  • Page 92: Figure A.5 Assembling The Rack Mounting Kit

    To maintain the PRIMEQUEST 520A*/520/420 or add an optional unit to the system, the PRIMEQUEST 520A*/520/420 unit must be pulled out from the front of the rack. Appropriate measures, such as securing the rack to the floor, must be taken to prevent the rack from toppling when PRIMEQUEST 520A*/520/420 unit is pulled out.
  • Page 93: Rack Depth Conditions

    (2) Rack depth conditions The PRIMEQUEST 520A*/520/420 unit is mounted with slide rails (which come with the PRIMEQUEST 520A*/520/420) in a rack. Therefore, the rack must satisfy the conditions specified below as follows: (1) rack depth measured as the distance between the front and rear columns;...
  • Page 94: Rack Column Requirements

    To maintain the PRIMEQUEST 520A*/520/420 or add an optional unit to the system, the PRIMEQUEST 520A*/520/420 unit must be pulled out from the front of the rack. If this equipment is mounted in a rack manufactured by another company, the cable management mechanism cannot be used in the rack.
  • Page 95 Reserving a work area (service area) for maintenance Reserve a service area for maintenance work by a certified service engineer. Referring to the description of the service area for Fujitsu racks in Section 1.4, "Equipment Floor Plan,"...
  • Page 97: Acronyms & Abbreviations

    Acronyms & Abbreviations AC Section Peripheral Component Interconnect Power Supply Unit (AC to DC) Circuit Breaker Central Processing Unit System Board SCSI Small Computer System Interface Fibre Channel Uninterruptible Power Supply Unshielded Twisted Pair International Electrotechnical Commission VHDCI Very High Density Cable Interconnect Local Area Network Wide Area Network U41644-J-Z816-5-76...
  • Page 99: Index

    AC cable specification Fujitsu Technology Solutions ..2-33, A-1 main unit ......2-31 .
  • Page 101 Comments Fujitsu Technology Solutions GmbH User Documentation 33094 Paderborn Suggestions Germany Corrections Fax: (++49) 700 / 372 00001 e-mail: manuals@ts.fujitsu.com http://manuals.ts.fujitsu.com Submitted by Comments on PRIMEQUEST 520A/520/420 Installation Planning Manual U41644-J-Z816-5-76...
  • Page 103 Comments Fujitsu Technology Solutions GmbH User Documentation 33094 Paderborn Suggestions Germany Corrections Fax: (++49) 700 / 372 00001 e-mail: manuals@ts.fujitsu.com http://manuals.ts.fujitsu.com Submitted by Comments on PRIMEQUEST 520A/520/420 Installation Planning Manual U41644-J-Z816-5-76...

This manual is also suitable for:

Primequest 520Primequest 420

Table of Contents