Siemens SINUMERIK Commissioning Manual page 148

Sinumerik 840di sl/840d sl/840dbase software and hmi advanced
Hide thumbs Also See for SINUMERIK:
Table of Contents

Advertisement

Diagnostics and service
5.4 Setting-up and upgrading the system
5.4
Setting-up and upgrading the system
5.4.1
Series commissioning
Series commissioning
The "series commissioning" function is used to back-up (archive) the data of a control. This
data back-up can also be transferred to other controls so that they are all brought into the
same state. In this case, NC, PLC, drive and - if required, HMI data - can be separately
saved or together in back-up (archive) files and then downloaded again from there. For NC
data, optional compensation data of the axes can also be saved.
The drive data cannot be changed and can be optionally saved in the acx format as binary
data or in the xml format.
Requirements
Access authorization is required to carry-out series commissioning. The access
authorizations and other settings for the archive are assigned in the file DINO.INI.
The following access levels are preset:
● From access level 3 onwards (password): To generate an archive for series
● From access level 4 (key-operated switch): To download an archive for series
142
commissioning.
commissioning.
Figure 5-4
Creating a series commissioning archive
Commissioning Manual, 03/2009, 6FC5397-0DP10-3BA0
HMI Advanced (IM4)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents