SSANGYONG Y200 Manual page 1510

Hide thumbs Also See for Y200:
Table of Contents

Advertisement

5D2-88 TRANSFER CASE - TOD
54. Holding the slotted support bracket tight against
the motor housing end, secure the bracket to the
transfer case, tightening the bolt with lock washer.
Installation Notice
Tightening Torque
55. Retighten the two nuts that attach the slotted
support bracket to the end of the motor.
Installation Notice
Tightening Torque
56. Install the clutch coil wire terminal(brown) and other
shift motor wires to the 7-pin connector(black).
57. Install the connector retainer at the connector end.
58. Connect the front and rear speed sensors wiring
to the 7-pin connector(white).
59. Install the rear case flange on the output shaft.
60. Install the rubber seal, output shaft yoke washer
and nut. Tighten the nut.
Installation Notice
Tightening Torque
61. Install the drain plug and tighten.
Tightening Torque
62. Fill the transfer case with 1.4 liters of Automatic
Transmission Fluid or equivalent.
63. Install the fill plug and tighten.
Installation Notice
Tightening Torque
64. Install the transfer case as outlined in removal and
Installation.
8 - 11 N•m
(71 - 97 lb-in)
3 - 6 N•m
(27 - 53 lb-in)
137 - 196 N•m
19 - 30 N•m
(14 - 22 lb-ft)
19 - 30 N•m
(14 - 22 lb-ft)
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents