Unit Repair; Rebuild Warnings - SSANGYONG Y200 Manual

Hide thumbs Also See for Y200:
Table of Contents

Advertisement

5A-162 AUTOMATIC TRANSMISSION
Prior to rebuilding a transmission system, the following warnings are to be noted.
Ensure that, before replacing a transmission the cooler lines are flushed out to remove any debris. This can be
done by applying compressed air to the rear cooler line forcing oil and any contaminants out of the front cooler
line.
The cooler flow should be checked after the transmission has been fitted. With the front cooler line connected
and the rear line run into a suitable container, measure the flow over 15 seconds with the vehicle idling in park.
The flow rate should exceed 1 liter in 15 seconds.
Be wary of any situation where water enters the transmission. This may result in fluid foaming and leaking
through the breather.
Ensure that both earth straps (one at the battery terminal and one on the vehicle body) are connected in the
vehicle before connecting the positive side of the battery.
Follow the throttle position calibration procedure in this manual if the engine control module/ transmission
control module (ECM/TCM) is swapped.

UNIT REPAIR

REBUILD WARNINGS

KAA5A710
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents